
Sacramento Unified School District
Genesis High School
Theodore Judah Elementary
Washington Elementary
Kit Carson International Academy
K McClatchy High School
2016 Emergency Repair Projects

Thermalito Union School District
Heritage & Pioneer Community Day Schools

Fall River Joint Unified School District
Burney Elementary School
Burney High School
Fall River Elementary School

Marysville Joint Unified School District
District W.T. Ellis
Dobbins Elementary Schools
Loma Rica Elementary Schools

Johnstonville Elementary School District
Johnstonville Elementary School
Robla Unified School District
Main Avenue Elementary School
Bell Avenue Elementary School
Robla Pre School
Lake Tahoe Unified School District
South Lake Tahoe High School
South Lake Tahoe Middle School
Bijou Community School
Black Oak Mine Unified School District
Georgetown Elementary School
Northside Elementary School
Golden Sierra High School
Otter Creek School
American River Charter School
Pre-Design /Planning Phase
•Facility assessment
•Technology assessment
•Consultant selection
•Environmental impact studies
•Master scheduling and budgeting
•State funding analysis
•Meeting coordination
•Cash flow projections/management
• Project Delivery Methods Evaluation and Recommendations
Design Phase
•Building standards
•Design management
•Design procedures manual
•Design/construction reviews
•Code review
•Value engineering
•Cost estimating
•Front-end bid document preparation (General Conditions)
Bid Phase
•Contractor Prequalification
•Contractor Prequalification
•Community outreach
•Working with city, county and state agencies on plan checks and permitting
•Bid procedures and bid package strategies
•Bid advertising and marketing
•Bid alternates to maximize bid result options
•Pre-bid conference
•Bid evaluations
•Obtain necessary permits
Construction Phase
•Pre-construction conference
•Regular project team meetings
•Establish on-site field offices
•Budget control
•Schedule management
•Document control (RFIs, submittals, and management)
•Coordination of special testing and inspections agencies
•Procurement of assistance for district supplied furniture, fixtures and equipment
•Change order/time extension requests
•Review analysis and recommendation
•Contingency management and reporting
•Monthly project reports
•Move management
•Monitor contractor safety program
Project Close-Out Phase
•Coordinate district move-in process/installation of furniture, fixtures and equipment
•Close out documents/records archiving
•Final punch list
•Coordinate owner training on building systems
•Operations and Management manuals/warranties/guarantees
•Building Commission